|
|
|
Construction Chemical Consultancy Co
|
|
| |
| Products |
|
 |
CementBased,Self-Levelling,Rotre-FreeWidening,FluidMortar |
|
|
|

|
|
|
Model Number |
GROUT 50 C |
Cement based, self - levelling, rotre - free widening, fluid mortar
DESCRIPTION: eile Grout 50 C self-levelling, widens without rotre, high resistant grout
mortar. Eile Grout 50 C is ready to use, in powder form and only water is added. It is a water
mortar that repairs cracks and bending at fresh and hard places. It is water resistant and
stable. It has strong adhesion to steel and cement. It does not include metal agrega and
chloride.
FIELD OF USAGE:
?At Gasoline and steam turbines
?At generators
?At compressors
?At pumps
?At pit saws
?At Wheat grinders
?At carpenter? plane
?At Cranes
?At Grinders
?At marble cutting machines
?At columns prefabricated
constructions
?At cracks, gaps and holes
?At Concrete coating, curtain
and column caps
CHARACTERISTICS: Solution is obtained which does not become rough having super fluency
and plenty of flowing for 20 - 25 sec at conic experiment made by mixture of 20% water. Water
out coming is not seen. The completed tests showed 0,3% widening. This value is below the
permitted standards. Eile Grout 50C widening occurs at plastic and pre hardening periods and
completed within 12 hours. Water leaking is not seen at samples, although 20 atmospheric
pressure is given.
APPLICATION: Preparing Machine and Base. Before placing the machine the loose, damaged
parts and particles must be cleaned in the concrete and the surface must be roughed by a cutter
and any kind of foreign materials such as grease oil, oil dust that are on the screw and base
plate. The machine is placed and its position and the correctness must be made and after that
this position must not be changed. If the adjustment woods need to be taken out they must be
greased lightly. After completing the placement and adjustment of machine, at least 6 hours
before the application the base concrete must be fed with water. The plenty water must be
cleaned on the heated surfaces.
Preparing Molds: The molds must be prepared as not to absorb free water and water resistant
and must be mounted as resistable to forces that may occur during process. Pouring gap of 15
cm must be left at the application place where base plate and the mold settle. 5 cm gap is
enough for other parts To provide the pressure for disperse of solution, the mold height can be
decreased when required.
Mixing: The proposed mixture water is added into mixer and the mixer runs. During mixing,
hand driller can be used with a suitable tip. Eile GROUT 50 C pack must be poured into water
quickly without any break. After emptying the pack, you may go on mixing for 2 - 3 minutes. The
mortar must be well mixed and it mustn? have any collected dry parts.
Application method: Solution pouring must be continuous and vibrator must not be used, To
prevent the air bubbles, it is enough to pour from a single side. It mustn? be poured from two
sides. You must provide fully fill the gap between the base floor and the base plate. The open
surfaces must be protected for 24 hours against water loss. Application can be made between
+5 - +30 Celsius degree temperature.
TECHNICAL INFORMATION:
Type : Cement Based grey powder
Unit weight : 2,2 / 2,3 Kg/Lt , fresh mortar
Resistance : (23°C / 50% Humidity)
1 DAY Pressure : 25 - 40 N/mm2
28 DAYS pressure : 60 - 90 N/ mm2
Widening : 0,30 % 0,60 (28 DAYS)
|
|
|
|
| |
|
|
|